top of page
Winter Concrete Pour with LumiNode Sensors.png

Don't let winter crack your schedule

Winter is coming, and so are your first cold-weather pours. Most teams still handle that with manual readings and cylinders cured off-site. LumiCon measures the actual placement instead.  

LumiCon gives your team:

Lumicon (2).png
Live in-situ temperature data

Know what’s happening inside every pour, 24/7, without sending anyone out for manual readings.

Less Rework (2).png
Real-time alerts enabling action

Get notified when a pour trends toward its limit, so your team can act before it becomes a problem.

Less Rework (1).png
Automatic QC reports

Every pour is documented automatically and ready to share, with no spreadsheets to build after the fact.

Lumicon On Site.png
Fewer NCRs and less rework

Catch temperature drops overnight and protect the pour before damage shows up in testing.

Lock in your winter order

 Make sure every site with cold-weather pours has LumiCon ready. Order by November 15 to have it on site before your first winter pour.

​

Fill in your details and our team will follow up within 24 hours to get your project set up.

bottom of page